Open Menu

By Rosie Breakwell • Published on 12th September, 2024

Join me (Nicole – Event Procurement Coordinator), for a typical day in the Bath & West Office…

8:00am:

After a rather chaotic start to the day I’m out the door and on the way to do the nursery run and drop my 3 year old daughter Maisie off, I do enjoy the peaceful drive on the way in to work!

 

9:00am

In the office armed with a cup of strong coffee, I will have a look through my emails to see if I need to deal with anything urgent and check through the to-do list. Then I will take a look at what jobs have come through recently for the estates team and allocate them out accordingly.

 

10:30am

Being in the estates team means we cover every part of Bath & West life, from the Main Show to Field to Food along with the day to day upkeep of the Showground itself. I’m lucky enough I get to sit in the dry office most of the time however I am envious of the site team when the sun is shining!

Weather depending I will try to find some jobs to do outdoors, sometimes it’s even as exciting as just going round and checking toilet blocks and bins however today I am loading bales of shavings onto a telehandler in the pouring rain, nothing glamorous about that!

 

12:00pm

We make all of our own signs and banners on site and with Dairy Show coming up in a few weeks I’m in the print room making Welcome banners and printing sponsors presentation signs.

1:30pm

Time for some lunch and a walk around the showground now that the rain has stopped! The 240 acre site really is a treat to walk around, get some fresh air and stretch my legs.

 

2:00pm

Now I need to do some Dairy Show ‘admin’. Sending out our contractors handbooks and requesting all relevant insurance documents for the contractors that will be coming on site and dealing with marquee, equipment, PA hire etc.

We only use a small amount of external contractors for Dairy Show as most of the work and equipment needed is done in house so only 11 for me to deal with. Compared to over 60 for our Royal Bath & West Show this is a welcome amount!

 

3:30pm

We use AutoCAD to plan the layout of all our shows so I’m now sitting down with a colleague and looking at layout options for next years Main Show. Re jigging layouts within the marquees. This is quite time consuming so requires another strong coffee and some concentration towards the end of the day.

 

5:00pm

End of the day now after a final run through of the to do list so I know what I have to do tomorrow. Then it’s in the car and off to pick up my daughter from nursery and get ready for a few manic hours before bedtime!

« Back to Blog